Skip to product information
1 of 4

Shenzhen Opto

5mm Electric Blue Led Diode Round Head 100pcs LED, Long Lead, With Edge 480nm

5mm Electric Blue Led Diode Round Head 100pcs LED, Long Lead, With Edge 480nm

Regular price $10.80 AUD
Regular price $0.00 AUD Sale price $10.80 AUD
Sale Sold out
Shipping calculated at checkout.

Mounting Style: Through-Hole

Nominal Current Rating: 20 mA

Configuration: Single

Viewing Angle: 35°

Custom Bundle: No

Lens Shape: Round

Item Diameter: 5 mm

Nominal Voltage: 3 V

MPN: Does Not Apply

LED Size: 5 mm

Modified Item: No

Wavelength: 480nm

Brand: Shenzhen Opto

Type: Clear Round Head

Number of Pins: 2

Model: No Skirt

Packaging: Antistatic Bag

LED Colour: Electric blue

Number of LEDs: 100

Country of Origin: China

Forward Voltage: 2.9 V

UPC: Does not apply

5mm Electric Blue 100 Pcs, Led Diode Round Head LED with Skirt Long Lead 480nm. Condition is Brand New. Sent with Australia Post Domestic Regular Letter.


Manufacturer: Shenzhen Opto

Chip: San’an

Vf: 2.9 VDC (Max 3.1V)

Current: 0.02 Amp 20mA

Colour: Electric Blue

Spectrum: 480nm

Pin Length: 27-29mm



The colour was really hard to photograph. It shows it with a green tint and dull. It is a bright light blue. The colour is generated via the silicon die, and not the standard Phosphor overlay.

Vf 2.9-3.1volts

Shipping & Returns

View full details